Interlayer method (cement mortar finish coat surfaces)
- Remove all objects, dust, and loose material from the construction surface.
- Apply one coat of waterproofing primer to the whole surface and wait for 30 minutes before applying the next coat.
- Apply 2-3 coats of elastic cement to the whole surface at 30-minute intervals.
- Upon application, continue with the cover layers (tiling).
.jpg)
-.jpg)