P-800
Exterior wall facelift

Plimates Energy Saving Paint P-999

Heat insulation, self-cleaning, noise reduction, waterproofing paint with aerospace nanomaterials

【Description】

P-999 is a multifunctional exterior coating with the latest aerospace technology nanomaterials. It has excellent waterproofing, heat insulation, self-cleaning, and noise reduction capabilities. In line with ESG, it saves on air conditioning electricity, enhances the protection of buildings, and reduces maintenance costs. P-999, a groundbreaking 4-in-one coating product.

【Properties】

  • Water & weather resistance, exhibit great waterproofing effect.
  • Construction process can be simplified with this 4-in-1 coating (heat insulation, noise reduction, self-cleaning and waterproofing).
  • Saving air-conditioning electricity costs: Utilizing advanced aerospace nanomaterials, this technology reduces thermal conduction. It offers long-term, high performance heat insulation, ensuring sustained energy-saving benefits.

【Uses】

  • Used for waterproofing and thermal insulation maintenance projects for roofs, external walls and metal sheets.
  • Used as topcoat for flexible cementitious waterproofing coating, water-based rubberized asphalt etc.

【Methods】

  • Remove all objects, dust, and loose material from the surface.
  • Reinforce waterproofing protection at leak-prone areas (cracks, external corners, cold joints, and drains) by wet-on-wet application: Apply 2-3 coats of Plimates elastomeric waterproofing layer (e.g., water-based PU, flexible cementitious waterproofing coating). Embed anti-cracking mesh when the first coating is still wet.
  • Apply Plimates waterproof primer based on the surface on which the system is to be applied. Wait for the primer to dry, then apply at least 2-3 thin layers of P-999 diluted with water (0-10%).

【Reminders】

  • Apply multiple thin coats for better results; excessive film thickness in one layer is prone to cracking.
  • Ensure complete coverage to protect the area from any latent leakage which may cause blisters, bubbles, peeling, and flaking.
  • Flood test can only be done when the coating is fully cured (requires about 7 days) to avoid premature issues such as blisters and bubbles.

【Packaging】

15kg.

【Color】

White (optimal for heat insulation), Beige, Gray; others upon request.

【Consumption】

Around 9㎡ / Dried membrane thickness of 1mm.

(Consumption depends on substrate roughness, surface profile, application method etc.) 

【Application tools】

Brush, Roller, or Spray equipment.

【System Structure

solution-detail-1