2019/03/14

The relationship between the maturation time of the waterproofing material and reaching the standard of physical properties

If the waterproof layer needs to be verified and tested, it needs enough time for curing (recommended seven days). If the curing time is not enough, the waterproof efficiency will also be reduced, or even lose its effect.

solution-detail-1