Interlayer method (cement mortar surfaces)

    1. Remove all objects, dust, and loose material from the construction surface.
    2. Coating of cracks, parapet angles, and new/old seams may be reinforced by adding 2-3 coats of mid-coat waterproof coating.
    3. Apply one coat of oil-based ultra-strong primer curing agent and wait for 30 minutes before applying the next coat.
    4. Apply 2-3 coats of mid-coat waterproofing materials (rubberized asphalt, elastic cement) to the whole surface at 30-minute intervals.
    5. Upon application, allow a drying and curing time of 4-7 days prior to fitting of tiles or other stone materials.

Related Successful Projects