Interlayer method (cement mortar finish coat surfaces)

    1. Remove all objects, dust, and loose material from the construction surface.
    2. Apply one coat of waterproofing primer to the whole surface and wait for 30 minutes before applying the next coat.
    3. Apply 2-3 coats of elastic cement to the whole surface at 30-minute intervals.
    4. Upon application, continue with the cover layers (tiling).

Related Successful Projects