Putty powder coating method

    1. Remove efflorescence and old paint films from affected and surrounding areas within a radius of 10-30cm.
    2. Mix  efflorescence resistant agent thoroughly with water at a ratio of around 4:1 to form a putty and apply the mixture evenly to the construction surface. (Note: The product dries quickly. Application should therefore be completed within 10 minutes after preparation. Water should be added if the mixture shows signs of hardening.)
    3. Coatings with a thickness of 1mm can be polished with sandpaper after a drying time of around 20 minutes

    Upon completion of surface polishing, wait at least 2 hours before applying paint.

Related Successful Projects