Transparent and membranous dirt-resisting method for substrates such as elastic and cement paint.
- Remove or wash off all objects, dust, and loose material from the construction surface and allow a drying time of at least 3 days (construction surfaces must be completely dry to prevent a whitish appearance of coatings).
- Apply 2 thin coats of double-component anti-yellowing highly dirt-resistant transparent finish paint (stir thoroughly prior to application).
- If other coatings have just been applied to the surface, it must be ensured that such coatings are fully cured prior to application of this product (allow a curing time of at least 1 day).
- Upon mixing, the product must be applied within a period of around one hour. Depending on weather and temperature conditions, dirt-resistance effects appear after around 2-5 days.